Our News

Pipework Installation

// Pipework Installation

Efficient Pipework Installation with the Stauff Walform System

At Advanced Hydraulics, we pride ourselves on our ability to adapt to changing circumstances and deliver high-quality results on time. Recently, we were tasked with installing pipework for a significant project that required the use of the Stauff Form EVO system for 38mm and 42mm outer diameter (o.d) tubes on a Besser block press. This project exemplified our commitment to excellence and our ability to overcome unexpected challenges.

Initial Design and Challenges

Initially, the plan was to run the pipework along and through a block wall. This wall was crucial for the structural integrity and placement of our pipework. However, during the laying of the machine foundations, the block wall was inadvertently destroyed. This unforeseen event required a prompt reassessment of the project design and the implementation of an alternative solution.

Adaptation and Redesign

Given the destruction of the block wall, we scheduled a further visit to discuss the design requirements for erecting a new steel framework. Our team worked closely with the client to ensure that the new framework would meet all necessary specifications and support the intended pipework layout.

Adjusted Timeline and Collaboration

Despite the setback, our client was adamant that the project completion date remain unchanged, even though our start date was delayed by a week. This posed a significant challenge, but our team at Advanced Hydraulics was determined to deliver.

We coordinated closely with various service providers on site to ensure a seamless integration of our work with other ongoing activities. This collaborative approach was essential to maintaining the project schedule and ensuring that all aspects of the installation were completed efficiently and to the highest standards.

Installation Process

Using the Stauff Walform system, we proceeded with the installation of the 38mm and 42mm o.d tubes. The Walform system is known for its reliability and ease of use, which was crucial given the tight timeframe. Our skilled technicians meticulously installed the steel pipework and hoses, ensuring that every connection was secure and met the rigorous standards required for the Bessa block press operation.

Successful Completion

Through careful planning, effective communication, and diligent execution, Advanced Hydraulics successfully completed the pipework installation within the new timeframe. Our ability to adapt to unexpected changes and collaborate effectively with other service providers was key to our success. The project not only met but exceeded the client’s expectations, reinforcing our reputation for excellence in hydraulic solutions.

At Advanced Hydraulics, we understand that every project comes with its unique challenges. Our recent pipework installation project is a testament to our resilience, expertise, and commitment to delivering quality results on time. Whether it’s adapting to sudden changes or integrating with multiple service providers, we have the skills and experience to ensure successful project completion. If you’re looking for a reliable partner for your hydraulic needs, look no further than Advanced Hydraulics.

For more information about our services and how we can assist with your next project, please contact us today.

Share this post

More News

// Energy recovery system brief: Advanced Hydraulics was approached by

// High pressure hydraulic test rig Key Requirements Brief: Advanced

// Hydraulic Flushing Unit for Remote Equipment Maintenance Key Requirements

// Coolant Flushing System Key Requirements Portability: The system must

// Hydraulic Power Unit A long-standing customer has requested the

// Pipework Installation Efficient Pipework Installation with the Stauff Walform